Installation, Calibration, and Equipment Testing for Dung Quat - Quang Ngai Project
Project Introduction The Dung Quat Oil Refinery in Quang Ngai is one of the most significant industrial investment projects in Vietnam, playing a vital role in meeting domestic and regional oil and gas demands. The project requires not only modern technology but also absolute precision and safety in the process of equipment installation, inspection, and calibration.
Scope of Work Northern Stars Technology and Equipment Service Co., Ltd. was honored to be entrusted with the installation and calibration tasks for the Dung Quat Oil Refinery Project, including the following main components:
-
Installation and calibration of automatic control systems: Ensuring high precision and stable operation.
-
Inspection and calibration of measuring instruments: Ensuring that technical parameters meet the project's strict requirements.
-
Electrical circuit testing and system commissioning: Evaluating the system's ability to operate as designed before being put into operation.
Challenges and Solutions During the execution of the project at the Dung Quat Oil Refinery, the company faced several challenges, such as:
With extensive experience and expertise, Northern Stars applied the most modern technological solutions to ensure project progress and high-quality construction.
Results Achieved
-
Completed the installation and calibration work as per the committed timeline.
-
Achieved 3 million safe working hours certification awarded by the investor and contractor.
-
Enhanced operational efficiency of the refinery, ensuring all systems operate stably and safely.
Conclusion The installation and calibration project at the Dung Quat Oil Refinery has confirmed Northern Stars expertise and reputation in the field of industrial calibration and installation. We are committed to continuing to provide optimal solutions and high-quality services, contributing to the sustainable development of Vietnam's industrial sector.