Nhà máy Nhiệt điện Phú Mỹ 2.2
(+84)2543614999 https://maps.app.goo.gl/HBYKN3xJijoZw1Xh6

Phu My 2.2 Thermal Power Plant

Phu My 2.2 Thermal Power Plant - Comprehensive Technical Solutions from Sao Phuong Bac

Client Mekong Energy/General Electric/Granite Service International/ABB Germany
Location Phu My - Viet Nam
Time 2008 - 2024
Scope of work Provide equipment and materials, install equipment; Calibrate and test measuring devices; Safety valve testing; Loop check and pre-commissioning; Provide preventive maintenance personnel; Inspect control systems and fire alarm systems; Install and test fiber optic cables; Inspect electrical equipment; Overhaul motors, inspect, maintain, and upgrade motors.
13 view

Project Overview

Sao Phuong Bac Company is proud to be the strategic partner providing specialized technical services for the Phu My 2.2 Thermal Power Plant, one of the key energy hubs in Vietnam. With over 15 years of collaboration with the project (2008-2024), we have established a leading position in the field of electrical engineering and industrial measurement services.

Project Details

  • Client: Consortium Mekong Energy / General Electric / Granite Service International / ABB Germany

  • Location: Phu My Industrial Park, Ba Ria - Vung Tau

  • Project Duration: 2008 - 2024 (ongoing)

Specialized Services

  • Provision and Installation of Systems

    • Supply of genuine equipment and materials meeting international standards

    • Installation of measurement and automation control systems

    • Implementation of industrial fiber optic systems

  • Calibration and Testing Services

    • Calibration of industrial measurement equipment according to ISO/IEC 17025

    • Inspection of pressure, temperature, and flow measurement systems

    • Safety valve testing in compliance with ASME standards

  • Maintenance and Operation

    • Provision of 24/7 preventive maintenance personnel

    • Overhaul and maintenance of gas turbine motors

    • Upgrade of central control systems

  • Technical Inspections

    • Loop check for the entire control system

    • Pre-commissioning tests before operation

    • Inspection of fire alarm and electrical safety systems

Benefits for Clients

  • High Precision: Optimally calibrated measurement and monitoring systems that meet international technical standards.

  • Enhanced Safety: Minimized risk of temperature incidents and conveyor operation failures through continuous monitoring.

  • Cost Efficiency: Optimized production processes, reduced maintenance time, and extended equipment lifespan.

  • Professional Support: A highly experienced technical team that accompanies clients from survey to handover, ensuring progress and quality.

Sao Phuong Bac’s Commitment

With the motto "Accuracy – Reliability – Efficiency," we not only provide services but also deliver comprehensive solutions for every technical challenge. The DAP2 Project is a testament to our ability to implement complex measurement systems in demanding industrial environments, reinforcing Sao Phuong Bac’s position as a leading trusted partner in the calibration and measurement industry.

Contact us now for consulting on calibration, testing, and optimal measurement solutions for your business!